R9m 6strands billets continuous casting machine
Casting radius: R9m
Electrical system: SIEMENS/DELTA Transducer, SIEMENS/DELTA PLC, SCHNEIDER contactors . PLC automatic controlling
Billet specification: 130*130mm,150*150,180X180mm,200*200mm,,220*220mm,240*240mm
Strand number: strands 6 strands
R9m,6strands,6-12meter billets CCM (italy technology)
Design according ITALY technology,Italy CCM OEM factory.
Biggest CCM factory1000workers in china.Chinese Government Company. R9 meter 2 strdans Iran project Accept KUNLUN bank payment.
R96S12GT
Ⅰ. Technical data
Capacity per hour: 150ton –240ton/hour
Casting radius: R9m
Billet specification: 130*130mm,150*150,180X180mm,200*200mm,,220*220mm,240*240mm
Strand number: strands 6 strands
Dummy bar : rigid dummy bar
Ladle support type: Ladle rotor tower
Cutting way: automatic flame cutting machine
Steel grade: Square billets :low alloy steel, common steel, and so on,Round billets : Alloy Steel.
Billet length:6-12m
Electrical system: SIEMENS/DELTA Transducer, SIEMENS/DELTA PLC, SCHNEIDER contactors . PLC automatic controlling
Ⅱ. Supply cope
1. On-line equipment list
No |
Equipment name |
Unit |
Qty. |
Remark |
---|---|---|---|---|
1 |
Ladle rotor tower 240000USD/set |
set |
1 |
|
2 |
Tundish moving car 9200USD/set |
sets |
2 |
|
3 |
Tundish 450USD/set |
pc |
2 |
|
4 |
Mould 8900USD/set |
pc |
6 |
|
5 |
Mould cover 150USD/set |
set |
6 |
|
6 |
Operating car/control cabinet 500USD/set |
set |
6 |
|
7 |
Oscillation device 16000USD/set |
set |
6 |
|
8 |
Secondary cooling manifold(stainless steel) and support 9000USD/set |
set |
6 |
Stainless steel |
9 |
Guide section for secondary cooling 8000USD/set |
set |
6 |
|
6 |
|
|
|
|
11 |
Withdrawal straightening machine 65000USD/set |
set |
6 |
|
12 |
Dummy bar 8000USD/set |
pc |
6 |
|
13 |
Dummy bar storage device 6000USD/set |
set |
6 |
|
14 |
Roller table before cutting 6000USD/set |
group |
6 |
|
15 |
Transmit roller table 15000USD/group |
group |
6 |
|
16 |
Discharge roller table 14000USD/group |
group |
6 |
|
17 |
Transverse pusher 82000USD/set |
set |
1 |
|
18 |
Cooling bed 60000USD/set |
set |
1 |
12meter bilelts |
19 |
Overflow chute 500USD/set |
set |
6 |
|
20 |
Hydraulic station system 25000USD/set |
set |
1 |
|
21 |
Automaticly Cooling water distribution system 30000USD/ |
set |
6 |
|
22 |
Electrical system |
set |
4 |
62000USD/set |
a |
Power supply conbinet |
set |
1 |
|
b |
Frequency conbinet |
set |
2 |
|
c |
PCL conbinet |
set |
1 |
|
d |
Main operating table |
set |
2 |
|
23 |
Automatic flame cutting machine 12000USD/set |
set |
6 |
|
24 |
Secondary cooling nozzle 4000USD/set |
set |
6 |
|
25 |
Auxiliary material(pipe,cable,etc online only ) 60000USD |
batch |
1 |
|
26 |
Steel contruction beam and operating platform and dummy bar storevage platform 150000USD |
batch |
1 |
|
2、Auxiliary equipment
No. |
Equipment name |
Unit |
Qty. |
Remark |
---|---|---|---|---|
1 |
Mould maintenance and pressure test bench: 1000USD |
set |
1 |
|
2 |
Drainage gun 50USD |
pc |
2 |
|
3 |
Cutting gun 50USD |
pc |
2 |
|
4 |
Ladle heater 20000USD |
set |
2 |
Not included operational |
5. |
|
set |
1 |
operational |
Lead time: 120 days
4. Payment way: 50% advance payment, 50% payment paid before date of shipment 5. Management Installation : ACCOMMODATION AND TRANSPORTATION COSTS will be paid by buyer .Totally overse charges paid by buer.
Debugging the buyer shall compensate the experts at USD 150 per day for delaying time per engineer. The seller should be responsible for the scene testing; After normal melting the seller should be responsible to guarantee repair or change of the faulty components in 6 months