8ton 4000kw smelting furnace
Model number:rated capacity of furnace 8ton,rated power of medium frequency supply 4000KW。
Power Consumption:550/600 kwh/T, Complete set supply range:furnace body 2set,furnace tilting device 1set,water cooling cable (6m) 8set, medium frequency supply cabinet 2set, capacitor cabinet
8t energy-conservation medium frequency induction furnace
(steel shell with magnetic yoke hydraulic tilting)
1. Model number:rated capacity of furnace 8ton,rated power of medium frequency supply 4000KW。
Power Consumption:550/600 kwh/T
2. Complete set supply range:furnace body 2set,furnace tilting device 1set,water cooling cable (6m) 8set, medium frequency supply cabinet 2set, capacitor cabinet (open type) 1set, low voltage distribution cabinet 2set, capacitance tank cabinet 1set, power tank 2set, hydraulic station system 1 set, water temperature and water pressure alarm 1set, furnace leak alarm 1set, the connect cable of medium frequency supply cabinet and capacitor cabinet 2piece, crucible 1set, Φ28 seamless steel tube 30metre, Free of spare parts of equipment: KK 1piece, KP 1piece, master control board 1piece.
3. Technical specification:6-phase incoming voltage of medium frequency supply source 950V, 12 pulse rectifier, output voltage of medium frequency supply 1650V. Rated power 4000KW, furnace body length4000, width3780, height3100, inductor inner diameter Φ1260, pillar height 2000.
4. Fit out components:silicon-controlled rectifier (SCR) for KP tube 1500A/3500V 12 set;KK tube 2000A/2500V 16 set(connecting in series-parallel), low-voltage distribution cabine1000V/2500A with 2 universal circuit breaker, capacity of compensate capacitor 40000kilovar.
5. Furnace tilting type: Hydraulic tilting
6. Master control board:The control circuit used one single master control board, it designed to be whole, and reduced connecting line greatly, fixed reliability, so avoided safe failure. This control circuit board is high degree of integration, the αangle automatic adjusted especially, that let power output of the equipment always was on constant condition, and electric power can be saved over 3% in comparison with same kind product. Safe start-up and automatic frequency-sweep.
7. Customer service: debugging , all the costs of seller’s experts go and work at abroad for return air tickets, accommodation and meals, will be borne by the buyer. The debugging period is 5 days, overstep the set time the buyer shall compensate the experts at USD 150 per day for delaying time. The seller should be responsible for the scene testing; After normal melting the seller should be responsible to guarantee repair or change of the faulty components in 6 months, such as master control board、reaction、compensate capacitor、hydraulic device、breaker、and furnace shell (except for lining break through, stoppage or shortage of cooling water supply for components).
8ton furnace delivery
Water temperature alarm
Leakage furnace alarm
FURNACE POWER SWITCH