Manufacture VHS Motors AC and DC motors

Metallurgy Machine etc...

技术领先的冶金设备

Leading metallurgical equipment

设备用于金属冶炼、金属锻造、金属打磨、矿石开采等服务

Focus on metal smelting, metal forging, metal grinding, ore mining and other services

Home    Continuous casting machine    R9m billets CCM
R9mbilletsCCM

R9m billets CCM

R9m заготовки СКК

 

 

R9m,2strands,6-12meter billets CCM (italy technology) 

Design according ITALY technology,Italy CCM OEM factory.

Biggest CCM factory1000workers in china.Chinese Government Company. R9 meter 2 strdans Iran project : Mr. Nouri bought 2016 years.(we can show you factory name if you are really buyer) Accept KUNLUN bank payment.

NO: R92S12GT

. Technical data

Capacity per hour: 50ton 80ton/hour

Casting radius: R9m

Billet specification: 130*130mm,150*150,180X180mm,200*200mm,220*220mm

Strand number: strands 2 strands

Dummy bar : rigid dummy bar

Ladle support type: Ladle Moving car

Cutting way: automatic flame cutting machine

Steel grade: Square billets :low alloy steel, common steel, and so on,Round billets : Alloy Steel.

Billet length:6-12m 

Electrical system: SIEMENS/DELTA Transducer, SIEMENS/DELTA PLC, SCHNEIDER contactors . PLC automatic controlling

Our R9 meter 2 strands CCM project Boss name is Mr. Nouris

2A36A542C0E96DCC0F1F83B93A9DE2FE

We have many other R6 meter ,R4 meter CCM project in iran .

We also have 20ton furnace, 30ton ,50tonfurnace,5ton furnace project in iran

 

. Supply cope

1. On-line equipment list     

No

Equipment name

Unit

Qty.

Remark

1

Ladle moving car 7400USD/set

set

2

   

2

Tundish moving car 9200USD/set

sets

2

 

3

Tundish 450USD/set

pc

2

 

4

Mold 8900USD/set

pc

2

 200x200mm 1set mold

5

Mold cover 150USD/set

set

2

 

6

Operating car/control cabinet 500USD/set

set

2

 

7

Oscillation device 16000USD/set

set

2

 

8

Secondary cooling manifold(stainless steel) and support 9000USD/set

set

2

Stainless steel

9

Guide section for secondary cooling 8000USD/set

set

2

 

10

Steam drainage system in the secondary cooling system 5000USD/set for simple Fan system

set

0

Operational:31000 USD

11

Withdrawal straightening machine 65000USD/set

set

2

 

12

Dummy bar 8000USD/set

pc

2

 

13

Dummy bar storage device 6000USD/set

set

2

 

14

Roller table before cutting 6000USD/set

group

2

 

15

Transmit roller table 15000USD/group

group

2

 

16

Discharge roller table 14000USD/group

group

2

 

17

Transverse pusher 42000USD/set

set

1

 

18

Cooling bed 20000USD/set

set

1

 12meter bilelts

19

Overflow chute 500USD/set

set

2

 

20

Hydraulic station system 25000USD/set

set

1

 

21

Automatically Cooling water distribution system 30000USD/

set

2

 

22

Electrical system  

set

4

62000USD/set

a

Power supply cabinet 

set

1

 

b

Frequency cabinet

set

 2

 

c

PCL cabinet

set

 1

 

d

Main operating table

set

 2

 

23

Automatic flame cutting machine 12000USD/set

set

2

 

24

Secondary cooling nozzle 4000USD/set

pc

120

 

25

Auxiliary material(pipe,cable,etc online only ) 20000USD

batch

1

 

26

Steel construction beam and operating platform and dummy bar storage platform 99000USD

batch

1

 

 

2Auxiliary equipment

No.

Equipment name

Unit

Qty.

Remark

1

Mold maintenance and pressure test bench: 1000USD

set

1

 

2

Drainage gun 50USD

pc

2

 

3

Cutting gun 50USD

pc

2

 

4

Ladle heater 12000USD

set

2

Operational

Not included

5.

15ton steel ladle 9000USD

set

1

Operational

Not included

automatic water distribution system with valve

Operational

Level control system (Red ray type)

Electrical magnet mixer

Lead time: 90 days

4. Payment way: 40% advance payment, 30%payment 1 month after contract(we preparing production raw material)30% payment paid before date of shipment or by L/C (opening bank need international famous bank)

5. Management Installation : ACCOMMODATION AND TRANSPORTATION COSTS will be paid by buyer .Totally oversea charges paid by buyer.

Debugging the buyer shall compensate the experts at USD 150 per day for delaying time per engineer. The seller should be responsible for the scene testing; After normal melting the seller should be responsible to guarantee repair or change of the faulty components in 6 months

 

 

 

DSC01418